Average salary: Rs1,396,999 /yearly
More statsSearch Results: 12,907 vacancies
...Job Description
Hitachi Energy is seeking recent graduates to join the India Power+ Graduate Rotational Program starting in September of 2024 for India location. As a Power+ Graduate, you will be a part of a full-time, 18-month rotational career journey where graduates...
Rs 1.8 - 2 lakhs p.a.
...functional checking, control valves, safety valves etc. at major shutdown jobs
Instrument Engineer,INSTRUMENT MAINT,Instrument Technician,Instrumentation,Power Plant
Designation: INSTRUMENT ENGINEER - POWER PLANT
Vacancies: 1
Experience: 2.0 Year(s) - 5.0 Year(s)...
Rs 1 - 2 lakhs p.a.
...Urgent requirement of Electrician for a reputed POWER Industry at Raipur location, Candidate should be responsible for : 1.Responsible... ...Attending to all electrical works in the Winery
ELECTRICIAN,POWER PLANT
Designation: ELECTRICIAN - POWER PLANT
Vacancies: 1...
Rs 8 - 9 lakhs p.a.
...BOE CERTIFICATE
We are Currently Looking for Sr Manager/General manager for Well reputed 10mw power plant at Bilaspur location.
Should be BOE CERTIFICATE
Operation and maintenance of boiler.
Monitoring and control on DM plant parameter.
Operation of turbine...
Rs 5 - 6 lakhs p.a.
...Physical Analysis:
Sieve analysis of Raw & Product of different size , Tumbler Index, RI, RDI, Shatter Index , Test of coke Bulk
Density.GCS,CCS
SID Chemist,Chemistry
Designation: CHEMIST - power plant
Vacancies: 1
Experience: 5.0 Year(s) - 10.0 Year(s)...
Rs 7 - 8 lakhs p.a.
...members.
CONTACT FOR MORE DETAILS
TEJANSH SAHU
(***) ***-****
****@*****.***
Interview Date - Monday - Friday
MANAGER,INSTRUMENTATION
Designation: MANAGER - INSTRUMENTATION (POWER PLANT)
Vacancies: 1
Experience: 10.0 Year(s) - 15.0 Year(s)...
Rs 18 - 30 lakhs p.a.
...upcoming projects in assigned areas which accounts for nearly 40% of plant systems . - To maximise plant availability at budgeted cost... ...893007335, (***) ***-****
Go Through click & Download App
SID,POWER PLANT,VP,GM
Designation: VP/GM - POWER PLANT
Vacancies: 1...
Rs 12 - 15 lakhs p.a.
...Plant Capacity:20Mw 110tph
Design a plan of action & review mechanism to achieve targeted operation parameters
- Cost Optimization... ...Erection & Commissioning,Preventive Maintenance
Designation: Lead-Power plant
Vacancies: 1
Experience: 25.0 Year(s) - 35.0 Year(s)...
Rs 24 - 30 lakhs p.a.
...paperwork, and overseeing other managers . They will also work on the long-term strategic goals of the company ensuring the goals are being worked towards
GM,MANAGMENT,ELECTRICAL
Designation: GM/VP - POWER PLANT
Vacancies: 1
Experience: 15.0 Year(s) - 20.0 Year(s)...
Rs 8 - 12 lakhs p.a.
...Spares and consumables.
Arranging spares for equipment & updating indents in cooperation with stores as well as purchase Dept. for Power Plant Unit.
Planning for annual shutdown maintenance for BTG site after consulting from Operation dept.
Preparing of monthly...
Rs 2.4 - 3.6 lakhs p.a.
...B.E/Diploma (Mech.) with 2 to 3 years experience as a DCS Engineer in a Power Plant in operation .
Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control...
Rs 6 - 9 lakhs p.a.
...Daily monitoring and control of energy consumption of the entire plant.
To ensure compliance with quality standards and maintain related... ...To ensure control on running cost of utilities.
To maintain Power Factor at the company level. Adherence to monthly & yearly...
Rs 2.4 - 3 lakhs p.a.
...Urgent Requirement of Instrument Engineer for for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in INSTRUMENT...
Rs 2.4 - 3 lakhs p.a.
...required software.
Knowledge of applicable codes related to electronic engineering.
Proficient in design and calculation software.
ELECTRICAL ENGINEER,POWER PLANT
Designation: ELECTRICAL ENGINEER - POWER PLANT
Vacancies: 3
Experience: 3.0 Year(s) - 5.0 Year(s)...
...Monitoring the safe and reliable operation of E&I equipment’s for CFBC Boilers, Turbines, ACCs, CHPs & its auxiliaries of Thermal power plant capacity 55 MW TPP, 21 MW WHRS.
Coordination with cement plant and electrical department to supply the uninterrupted power to the...
...GM AVP Operation Power Plant
Qualification: Diploma /B.Tech /EE Mechanical
Exp: 15+ Yrs
Track record of successfully developing & streamlining systems with ability to enhance operational
effectiveness and meet the operational goals Instrumental in changing cable...
Rs 8 - 10 lakhs p.a.
...AGM CONTROL & INSTRUMENTATION-POWER PLANT
Description:
You'll need to develop skills in specific control disciplines, such as:
advanced process control (APC)
distributed control systems (DCS)
programmable logic controllers (PLC)
supervisory control and data...
Rs 1.56 - 2.16 lakhs p.a.
Urgent Requirement of Electrical & Instrument TECHNICIAN at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed ...
Rs 18 - 24 lakhs p.a.
...innovations, strategic business development, and the profitability of the company as determined by the company's strategic goals
V
VP,MANAGMENT,COMMUNICATION SKILL
Designation: VICE PRESIDENT/HEAD - POWER PLANT
Vacancies: 1
Experience: 15.0 Year(s) - 20.0 Year(s)...
Rs 2.4 - 3 lakhs p.a.
...direction to trade/craft and engineers.
" Exposure of overhaul and general maintenance of following equipment's / sub system of power plants :
Generator, UAT / ST and Generator transformer, Plant Aux equipment's like Motors, Breakers, Modules, Switch gears, Relays Interlock...