Rs 3.6 - 4.2 lakhs p.a.
...battery of over 40 power presses, 6 CNC turret punching machines, 8 CNC Bending machines, 2 NC shearing machines, Fabrication, pre treatment, powdercoating and assembly all under one roof, it caters to Enclosure requirements of Electrical giants like Schneider Electric, Siemens...
Rs 1.8 - 3 lakhs p.a.
...the ETP department
Salary:- no bar for suitable candidates
Job Responsibility:
Supervision & Maintenance of ETP
Effluent Treatment plant all type of Water Treatment & stop water treatment
Spot Test of effluent treated water Operations of ETP, STP
Testing of...
Rs 3 - 4.2 lakhs p.a.
...MEE plant of different capacity
Responsible for process and operation in ETP. Good knowledge about primary, secondary, tertiary treatment. Prominent knowledge about RO and UF filtration systems.
Water Management in plant
All Analysis for COD, BOD, TDD, DO, TURBIDITY...
Rs 2.4 - 2.8 lakhs p.a.
..., Pumps, Air
compressor, Dryers, Cooling Tower, Chillers, Push & pull Blowers,
TEJAS Vaccum machine, Electrical boiler, water treatment plant,
Firefighting pump house, DG, substation, Elevator, Hoist,
Managing inspection, operations, maintenance, and U T I L I T...
Rs 2.4 - 3.6 lakhs p.a.
...Experience: Up to 2 to 5 years experience in same pattern industry (Powder coating)
Salary: Up to 3.60 Lac(s) JOB PROFILE:
Pre-Treatment process knowledge
Powder coating process knowledge
Timely verification of pre-treatment tank point age & Ph level & Maintain as...