Search Results: 18,680 vacancies

Rs 5 - 6 lakhs p.a.

 ...Physical Analysis: Sieve analysis of Raw & Product of different size , Tumbler Index, RI, RDI, Shatter Index , Test of coke Bulk Density.GCS,CCS SID Chemist,Chemistry Designation: CHEMIST - power plant Vacancies: 1 Experience: 5.0 Year(s) - 10.0 Year(s)... 

VINAYAK JOB CONSULTANT

Raipur
7 days ago

Rs 12 - 15 lakhs p.a.

 ...Plant Capacity:20Mw 110tph Design a plan of action & review mechanism to achieve targeted operation parameters - Cost Optimization...  ...Erection & Commissioning,Preventive Maintenance Designation: Lead-Power plant Vacancies: 1 Experience: 25.0 Year(s) - 35.0 Year(s)... 

Parth Globus Infotech

Kolhapur
7 days ago
 ...Power plant operators perform a wide variety of tasks to ensure optimal and safe operation of equipment that produces and distributes electrical power. They may operate control systems, monitor gauges and meters, perform routine checks, maintain equipment and start or stop... 

RIANSHI DEVELOPERS PRIVATE LIMITED

Bangalore
14 days ago

Rs 2.4 - 3.6 lakhs p.a.

 ...B.E/Diploma (Mech.) with 2 to 3 years experience as a  DCS Engineer in a  Power Plant in  operation . Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control... 

VINAYAK JOB CONSULTANT

Raipur
7 days ago
 ...Monitoring the safe and reliable operation of E&I equipment’s for CFBC Boilers, Turbines, ACCs, CHPs & its auxiliaries of Thermal power plant capacity 55 MW TPP, 21 MW WHRS. Coordination with cement plant and electrical department to supply the uninterrupted power to the... 

Randstad

Raipur
9 days ago

Rs 6 - 9 lakhs p.a.

 ...Daily monitoring and control of energy consumption of the entire plant. To ensure compliance with quality standards and maintain related...  ...To ensure control on running cost of utilities. To maintain Power Factor at the company level. Adherence to monthly & yearly... 

VINAYAK JOB CONSULTANT

Ranchi
7 days ago

Rs 5 - 6 lakhs p.a.

 ...We are looking for Electrical MANAER for 8MW Power Plant at Bilaspur location. "Lead and provide technical direction to the team and responsibility for efficient and reliable maintenance of Electrical systems. Provide technical direction to trade/craft and engineers.... 

VINAYAK JOB CONSULTANT

Raipur
15 days ago

Rs 3 - 3.6 lakhs p.a.

 ...update station operation records and prepare all required reports on plant operation. Direct supervise the operations and maintenance...  ...be appropriate. Specially perform on switching switchgear of power plant substation in LV, MV and high voltage system. Issue work... 

VINAYAK JOB CONSULTANT

Chhattisgarh
14 days ago

Rs 40 - 50 lakhs p.a.

 ...attention to detail. Strong analytical and problem-solving skills. Proficient with Microsoft Office Suite or related software. VP MECHANICAL,VP ELECTRICAL,VP POWER PLANT Designation: VP POWER PLANT - BILASPUR Vacancies: 1 Experience: 25.0 Year(s) - 30.0 Year(s)... 

VINAYAK JOB CONSULTANT

Bilaspur
10 days ago

Rs 2.4 - 3 lakhs p.a.

 ...Urgent Requirement of Instrument Engineer for for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in INSTRUMENT... 

VINAYAK JOB CONSULTANT

Raipur
7 days ago

Rs 2 - 4 lakhs p.a.

 ...turbine’ and auxiliary, Operation and maintenance of balance of plant Like : CHS, CT, DG Set, WTP. , Knowledge of MS office for...  ...Boiler and Extraction steam turbine operation and maintenance CPP,Power Plant,FBC,Boiler Engineer Designation: CPP Technician -... 

SDP HR Solution

Ankleshwar
7 days ago

Rs 2.4 - 3.6 lakhs p.a.

 ...design and development of electricity-related products, such as power systems and household appliances. They collaborate with electronics...  ...PRABHA - (***) ***-**** ELECTRICAL ENGINEER,ELECTRICAL,POWER PLANT Designation: ELECTRICAL ENGINEER (POWER PLANT) - RAIGARH Vacancies... 

VINAYAK JOB CONSULTANT

Raigarh
10 days ago

Rs 3 - 3.6 lakhs p.a.

 ...project management experience Excellent oral and written communication skills Detail-oriented and highly safety-conscious BOILER FIELD ,BOILER FIELD OPERATOR Designation: BOILER FIELD OPERATOR(POWER PLANT) Vacancies: 1 Experience: 3.0 Year(s) - 5.0 Year(s)... 

VINAYAK JOB CONSULTANT

Raipur
13 days ago

Rs 1.8 - 3 lakhs p.a.

 ...budgetary integrity and client satisfaction   JOB APPLY  CONTACT -  SHWETA (***) ***-**** mechanical ,fitter,iti fitter,ITI FITTER ,MECHANICAL FITTER ,MECHANICAL Designation: Mechanical Fitter-Gujrat power plant Vacancies: 12 Experience: 2.0 Year(s) - 3.0 Year(s)... 

VINAYAK JOB CONSULTANT

Gandhinagar
7 days ago

Rs 6 - 15 lakhs p.a.

 ...Brine chillers, Thermic heaters/Boilers, Air compressors, DM/RO plants of any design 13 Carry out Preventive maintenance of utility...  ...Utility,Maintenance Designation: AM / DM / Manager - Utility & Power Plant Vacancies: 3 Experience: 10.0 Year(s) - 15.0 Year(s)... 

SDP HR Solution

Bharuch
7 days ago

Rs 1.8 - 3 lakhs p.a.

 ...Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed... 

VINAYAK JOB CONSULTANT

Raipur
29 days ago
 ...Ensure constant flow of electricity to avoid blackouts Monitor power-generating equipment fueled by coal, gas, nuclear energy,...  ...Electricity is one of our nations most vital resources. Power plant operators, distributors, and dispatchers control power plants and... 

ENVICARE TECHNOLOGIES PRIVATE LIMITED

Bangalore
a month ago

Rs 3.6 - 4.2 lakhs p.a.

 ...everything goes smoothly for everyone during a given work shift, including stocking inventory all day long until closing down at night TIME MANAGEMENT,SHIFT INCHAGE Designation: OPERATION SHIFT INCHARGE - POWER PLANT Vacancies: 6 Experience: 6.0 Year(s) - 8.0 Year(s)... 

VINAYAK JOB CONSULTANT

Raigarh
7 days ago

Rs 15 - 22 lakhs p.a.

 ...Duties/Responsibilities: Operates plant equipment to generate enough electrical power to meet demand; regulates flow of power between generating stations and substations. Uses software, tools, and other devices to control and change equipment settings. Monitors plants... 

VINAYAK JOB CONSULTANT

Ranchi
7 days ago

Rs 3.6 - 5 lakhs p.a.

 ...shift, including stocking inventory all day long until closing down at night     JOB APPLY  CONTACT - RAKESH SINHA - (***) ***-**** SHIFT INCHAGE,POWER PLANT Designation: SHIFT INCHARGE - oration POWER PLANT Vacancies: 6 Experience: 8.0 Year(s) - 12.0 Year(s)... 

VINAYAK JOB CONSULTANT

Raigarh
16 days ago