Average salary: Rs330,000 /yearly
More statsRs 3 - 3.6 lakhs p.a.
...mechanical faults and plant outages and recommend repair of equipment as may be appropriate.
Specially perform on switching switchgear of power plant substation in LV, MV and high voltage system.
Issue work permit like cold work, hot work, lock out/tag out and isolation of...
Rs 1.8 - 3 lakhs p.a.
...materials used and hours worked.
Requirements:
Proven experience as a Welder in an industrial setting, preferably in a sponge iron power plant or similar heavy industry.
Proficiency in various welding techniques including SMAW, GTAW, and GMAW.
Ability to work at...
Rs 1.8 - 2 lakhs p.a.
...functional checking, control valves, safety valves etc. at major shutdown jobs
Instrument Engineer,INSTRUMENT MAINT,Instrument Technician,Instrumentation,Power Plant
Designation: INSTRUMENT ENGINEER - POWER PLANT
Vacancies: 1
Experience: 2.0 Year(s) - 5.0 Year(s)...
Rs 8 - 9 lakhs p.a.
...BOE CERTIFICATE
We are Currently Looking for Sr Manager/General manager for Well reputed 10mw power plant at Bilaspur location.
Should be BOE CERTIFICATE
Operation and maintenance of boiler.
Monitoring and control on DM plant parameter.
Operation of turbine...
Rs 7 - 8 lakhs p.a.
...members.
CONTACT FOR MORE DETAILS
TEJANSH SAHU
(***) ***-****
****@*****.***
Interview Date - Monday - Friday
MANAGER,INSTRUMENTATION
Designation: MANAGER - INSTRUMENTATION (POWER PLANT)
Vacancies: 1
Experience: 10.0 Year(s) - 15.0 Year(s)...
Rs 18 - 30 lakhs p.a.
...availability at budgeted cost ensuring safety & environment standards
Mr. Ritesh Agrawal
(***) ***-****, (***) ***-****
Go Through click & Download App
SID,POWER PLANT,VP,GM
Designation: VP/GM - POWER PLANT
Vacancies: 1
Experience: 20.0 Year(s) - 25.0 Year(s)...
Rs 1.8 - 2.4 lakhs p.a.
...Communicating with the rigging and construction team.
Breaking down rigging equipment and conducting post-rigging inspections.
Rigger,POWER PLANT,RIGGER
Designation: RIGGER - mechanical maintenance (POWER PLANT) - RAIPUR
Vacancies: 1
Experience: 1.0 Year(s) - 5.0...
Rs 8 - 12 lakhs p.a.
...Spares and consumables.
Arranging spares for equipment & updating indents in cooperation with stores as well as purchase Dept. for Power Plant Unit.
Planning for annual shutdown maintenance for BTG site after consulting from Operation dept.
Preparing of monthly material...
Rs 5 - 6 lakhs p.a.
...Physical Analysis:
Sieve analysis of Raw & Product of different size , Tumbler Index, RI, RDI, Shatter Index , Test of coke Bulk
Density.GCS,CCS
SID Chemist,Chemistry
Designation: CHEMIST - power plant
Vacancies: 1
Experience: 5.0 Year(s) - 10.0 Year(s)...
Rs 24 - 30 lakhs p.a.
...paperwork, and overseeing other managers . They will also work on the long-term strategic goals of the company ensuring the goals are being worked towards
GM,MANAGMENT,ELECTRICAL
Designation: GM/VP - POWER PLANT
Vacancies: 1
Experience: 15.0 Year(s) - 20.0 Year(s)...
Rs 1 - 2 lakhs p.a.
...Urgent requirement of Electrician for a reputed POWER Industry at Raipur location, Candidate should be responsible for : 1.Responsible for electrical repair & maintenance. 2.Responsible for preventive maintenance of all machines of various departments. 3. Responsible for operation...
Rs 1 - 2 lakhs p.a.
...Candidate should have ITI qualification and 3 year experience as Fitter in a large POWER PLANT.
3+ years of relevant experience in POWER PLANT as a mechanical Fitter Should be able to design tools and should be result oriented with time limit.o Minimum 3 to 5 years of Industry...
Rs 1.56 - 2.16 lakhs p.a.
Urgent Requirement of Electrical & Instrument TECHNICIAN at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed ...
Rs 2.4 - 3.6 lakhs p.a.
...B.E/Diploma (Mech.) with 2 to 3 years experience as a DCS Engineer in a Power Plant in operation .
Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control...
Rs 2.4 - 3 lakhs p.a.
...required software.
Knowledge of applicable codes related to electronic engineering.
Proficient in design and calculation software.
ELECTRICAL ENGINEER,POWER PLANT
Designation: ELECTRICAL ENGINEER - POWER PLANT
Vacancies: 3
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 2.4 - 4 lakhs p.a.
...load details.
electrical engineer,Electrical Project,Electrical Design,Building Electrical Engineer,Real Estate Electrical Engineer,Construction Electrical Engineer
Designation: ELECTRICAL ENGINEER - THARMAL POWER
Vacancies: 1
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 2.4 - 3 lakhs p.a.
...Urgent Requirement of Instrument Engineer for for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in INSTRUMENT...
...Monitoring the safe and reliable operation of E&I equipment’s for CFBC Boilers, Turbines, ACCs, CHPs & its auxiliaries of Thermal power plant capacity 55 MW TPP, 21 MW WHRS.
Coordination with cement plant and electrical department to supply the uninterrupted power to the...
Rs 18 - 24 lakhs p.a.
...innovations, strategic business development, and the profitability of the company as determined by the company's strategic goals
V
VP,MANAGMENT,COMMUNICATION SKILL
Designation: VICE PRESIDENT/HEAD - POWER PLANT
Vacancies: 1
Experience: 15.0 Year(s) - 20.0 Year(s)...
Rs 2.4 - 3 lakhs p.a.
...technical direction to trade/craft and engineers.
" Exposure of overhaul and general maintenance of following equipment's / sub system of power plants :
Generator, UAT / ST and Generator transformer, Plant Aux equipment's like Motors, Breakers, Modules, Switch gears, Relays...
Rs 8 - 10 lakhs p.a.
...AGM CONTROL & INSTRUMENTATION-POWER PLANT
Description:
You'll need to develop skills in specific control disciplines, such as:
advanced process control (APC)
distributed control systems (DCS)
programmable logic controllers (PLC)
supervisory control and data...
Rs 1.8 - 3 lakhs p.a.
...Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed...
Rs 1.8 - 2.4 lakhs p.a.
...around process equipment and confined spaces
CONTACT FOR MORE DETAILS
yunita das
(***) ***-****
yunita @vinayakjob.com
INSTRUMENT,POWER PLANT,INSTRUMENT TECHNICIAN
Designation: INSTRUMENT TECHNICIAN
Vacancies: 2
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 1.2 - 3.6 lakhs p.a.
...relating to electrical load requirements of wiring
JOB APPLY
CONTACT - MANISHA SAHU (***) ***-****
electrician,SR. ELECTRICIAN,TECHNICIAN
Designation: SR. ELECTRICIAN/ELECTRICIAN/TECHNICIAN (POWER PLANT) -RAIGARH
Vacancies: 8
Experience: 0 - 7.0 Year(s)...
Philips Engineering Services Philips Engineering Services, a company engaged in Operation & Maintenance of Coal Handling Plants of Thermal Power Plants at various states across India is urgently in need of following persons. The posting location shall be in any of our sites in...
Rs 40 - 50 lakhs p.a.
...attention to detail.
Strong analytical and problem-solving skills.
Proficient with Microsoft Office Suite or related software.
VP MECHANICAL,VP ELECTRICAL,VP POWER PLANT
Designation: VP POWER PLANT - BILASPUR
Vacancies: 1
Experience: 25.0 Year(s) - 30.0 Year(s)...
Rs 10 - 15 lakhs p.a.
...An Electrical Engineer is a skilled professional specializing in the design and development of electricity-related products, such as power systems and household appliances. They collaborate with electronics and transmission & distribution engineering fields to create essential...
Rs 3.6 - 4.2 lakhs p.a.
...everything goes smoothly for everyone during a given work shift, including stocking inventory all day long until closing down at night
TIME MANAGEMENT,SHIFT INCHAGE
Designation: OPERATION SHIFT INCHARGE - POWER PLANT
Vacancies: 6
Experience: 6.0 Year(s) - 8.0 Year(s)...
Rs 20 - 25 lakhs p.a.
...organized.
Strong work ethic.
Good interpersonal skills.
Meticulous attention to detail.
Computer literate.
Proactive nature.
GM ,AGM,DGM
Designation: GENERAL MANAGER POWER PLANT (GM ) - RAIPUR ,
Vacancies: 1
Experience: 20.0 Year(s) - 25.0 Year(s)...
Rs 1.44 - 1.8 lakhs p.a.
...Supervising electricians.
Ordering of electrical supplies and equipment.
JOB APPLY
MANISHA SAHU (***) ***-****
ELECTRICAL TECHNICIAN,ELECTRICIAN
Designation: ELECTRICAL TECHNICIAN (POWER PLANT)- RAIGARH
Vacancies: 1
Experience: 1.0 Year(s) - 5.0 Year(s)...