Average salary: Rs1,050,000 /yearly
More statsSearch Results: 297 vacancies
Rs 1.8 - 2 lakhs p.a.
...functional checking, control valves, safety valves etc. at major shutdown jobs
Instrument Engineer,INSTRUMENT MAINT,Instrument Technician,Instrumentation,Power Plant
Designation: INSTRUMENT ENGINEER - POWER PLANT
Vacancies: 1
Experience: 2.0 Year(s) - 5.0 Year(s)...
Rs 8 - 9 lakhs p.a.
...BOE CERTIFICATE
We are Currently Looking for Sr Manager/General manager for Well reputed 10mw power plant at Bilaspur location.
Should be BOE CERTIFICATE
Operation and maintenance of boiler.
Monitoring and control on DM plant parameter.
Operation of turbine...
Rs 18 - 30 lakhs p.a.
...electrical equipment & electrical distribution network & upcoming projects in assigned areas which accounts for nearly 40% of plant systems... ...893007335, (***) ***-****
Go Through click & Download App
SID,POWER PLANT,VP,GM
Designation: VP/GM - POWER PLANT
Vacancies: 1...
Rs 50 - 70 lakhs p.a.
...short brief about client
The Company.. main business interests are in Ferro Alloys, Power and Mining and it has its manufacturing facilities in Chhattisgarh, India, an area known for low cost production of Steel due to the easy availability of Raw Materials, Cheap Labor...
Rs 2.4 - 3 lakhs p.a.
...others to discuss existing or potential engineering products or projects.
Ensuring that installation and operations conform to standards... ...Proficient in design and calculation software.
ELECTRICAL ENGINEER,POWER PLANT
Designation: ELECTRICAL ENGINEER - POWER PLANT...
Rs 1.8 - 2.4 lakhs p.a.
...Communicating with the rigging and construction team.
Breaking down rigging equipment and conducting post-rigging inspections.
Rigger,POWER PLANT,RIGGER
Designation: RIGGER - mechanical maintenance (POWER PLANT) - RAIPUR
Vacancies: 1
Experience: 1.0 Year(s) - 5.0...
Rs 8 - 12 lakhs p.a.
...Spares and consumables.
Arranging spares for equipment & updating indents in cooperation with stores as well as purchase Dept. for Power Plant Unit.
Planning for annual shutdown maintenance for BTG site after consulting from Operation dept.
Preparing of monthly material...
...CFBC Boilers, Turbines, ACCs, CHPs & its auxiliaries of Thermal power plant capacity 55 MW TPP, 21 MW WHRS.
Coordination with cement... ...maintenance team.
Coordination for legal & statutory requirements of E&I.
Preparation for CAPEX proposals and executing CAPEX projects....
Rs 1 - 2 lakhs p.a.
...Urgent requirement of Electrician for a reputed POWER Industry at Raipur location, Candidate should be responsible for : 1.Responsible for electrical repair & maintenance. 2.Responsible for preventive maintenance of all machines of various departments. 3. Responsible for operation...
Rs 2.4 - 4 lakhs p.a.
...System within the estimated cost and Time schedules Monitoring the Project: Site Activity Management, Preliminary site preparation etc... ...Construction Electrical Engineer
Designation: ELECTRICAL ENGINEER - THARMAL POWER
Vacancies: 1
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 5 - 6 lakhs p.a.
...Physical Analysis:
Sieve analysis of Raw & Product of different size , Tumbler Index, RI, RDI, Shatter Index , Test of coke Bulk
Density.GCS,CCS
SID Chemist,Chemistry
Designation: CHEMIST - power plant
Vacancies: 1
Experience: 5.0 Year(s) - 10.0 Year(s)...
Rs 1 - 2 lakhs p.a.
...Candidate should have ITI qualification and 3 year experience as Fitter in a large POWER PLANT.
3+ years of relevant experience in POWER PLANT as a mechanical Fitter Should be able to design tools and should be result oriented with time limit.o Minimum 3 to 5 years of Industry...
Rs 1.56 - 2.16 lakhs p.a.
Urgent Requirement of Electrical & Instrument TECHNICIAN at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed ...
Rs 2.4 - 3.6 lakhs p.a.
...B.E/Diploma (Mech.) with 2 to 3 years experience as a DCS Engineer in a Power Plant in operation .
Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control...
Rs 1.8 - 3 lakhs p.a.
...Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed...
Rs 5 - 6 lakhs p.a.
...We are looking for Electrical MANAER for 8MW Power Plant at Bilaspur location.
"Lead and provide technical direction to the team and responsibility for efficient and reliable maintenance of Electrical systems.
Provide technical direction to trade/craft and engineers....
Rs 3 - 3.6 lakhs p.a.
...complex systems and/or the industrial sector
Supervisory and/or project management experience
Excellent oral and written communication... ...FIELD ,BOILER FIELD OPERATOR
Designation: BOILER FIELD OPERATOR(POWER PLANT)
Vacancies: 1
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 18 - 24 lakhs p.a.
...innovations, strategic business development, and the profitability of the company as determined by the company's strategic goals
V
VP,MANAGMENT,COMMUNICATION SKILL
Designation: VICE PRESIDENT/HEAD - POWER PLANT
Vacancies: 1
Experience: 15.0 Year(s) - 20.0 Year(s)...
Rs 2.4 - 3 lakhs p.a.
...Urgent Requirement of Instrument Engineer for for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in INSTRUMENT...
Rs 8 - 10 lakhs p.a.
...AGM CONTROL & INSTRUMENTATION-POWER PLANT
Description:
You'll need to develop skills in specific control disciplines, such as:... ...relevant authorities (e.g. the Nuclear Decommissioning Authority)
project management within cost and time constrained environments...