Search Results: 125 vacancies
Rs 5 - 6 lakhs p.a.
...Physical Analysis:
Sieve analysis of Raw & Product of different size , Tumbler Index, RI, RDI, Shatter Index , Test of coke Bulk
Density.GCS,CCS
SID Chemist,Chemistry
Designation: CHEMIST - power plant
Vacancies: 1
Experience: 5.0 Year(s) - 10.0 Year(s)...
Rs 1 - 2 lakhs p.a.
...Urgent requirement of Electrician for a reputed POWER Industry at Raipur location, Candidate should be responsible for : 1.Responsible for electrical repair & maintenance. 2.Responsible for preventive maintenance of all machines of various departments. 3. Responsible for operation...
Rs 1 - 2 lakhs p.a.
...Candidate should have ITI qualification and 3 year experience as Fitter in a large POWER PLANT.
3+ years of relevant experience in POWER PLANT as a mechanical Fitter Should be able to design tools and should be result oriented with time limit.o Minimum 3 to 5 years of Industry...
Rs 18 - 30 lakhs p.a.
...availability at budgeted cost ensuring safety & environment standards
Mr. Ritesh Agrawal
(***) ***-****, (***) ***-****
Go Through click & Download App
SID,POWER PLANT,VP,GM
Designation: VP/GM - POWER PLANT
Vacancies: 1
Experience: 20.0 Year(s) - 25.0 Year(s)...
Rs 2.4 - 3 lakhs p.a.
...required software.
Knowledge of applicable codes related to electronic engineering.
Proficient in design and calculation software.
ELECTRICAL ENGINEER,POWER PLANT
Designation: ELECTRICAL ENGINEER - POWER PLANT
Vacancies: 3
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 2.4 - 3.6 lakhs p.a.
...B.E/Diploma (Mech.) with 2 to 3 years experience as a DCS Engineer in a Power Plant in operation .
Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control...
Rs 1.8 - 3 lakhs p.a.
...Spares and consumables.
Arranging spares for equipment & updating indents in cooperation with stores as well as purchase Dept. for Power Plant Unit.
Planning for annual shutdown maintenance for BTG site after consulting from Operation dept.
Preparing of monthly material...
Rs 2.4 - 4 lakhs p.a.
...load details.
electrical engineer,Electrical Project,Electrical Design,Building Electrical Engineer,Real Estate Electrical Engineer,Construction Electrical Engineer
Designation: ELECTRICAL ENGINEER - THARMAL POWER
Vacancies: 1
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 2.4 - 3 lakhs p.a.
...Urgent Requirement of Instrument Engineer for for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in INSTRUMENT...
Rs 2.4 - 3 lakhs p.a.
...technical direction to trade/craft and engineers.
" Exposure of overhaul and general maintenance of following equipment's / sub system of power plants :
Generator, UAT / ST and Generator transformer, Plant Aux equipment's like Motors, Breakers, Modules, Switch gears, Relays...
...Monitoring the safe and reliable operation of E&I equipment’s for CFBC Boilers, Turbines, ACCs, CHPs & its auxiliaries of Thermal power plant capacity 55 MW TPP, 21 MW WHRS.
Coordination with cement plant and electrical department to supply the uninterrupted power to the...
Rs 8 - 10 lakhs p.a.
...AGM CONTROL & INSTRUMENTATION-POWER PLANT
Description:
You'll need to develop skills in specific control disciplines, such as:
advanced process control (APC)
distributed control systems (DCS)
programmable logic controllers (PLC)
supervisory control and data...
Rs 18 - 24 lakhs p.a.
...innovations, strategic business development, and the profitability of the company as determined by the company's strategic goals
V
VP,MANAGMENT,COMMUNICATION SKILL
Designation: VICE PRESIDENT/HEAD - POWER PLANT
Vacancies: 1
Experience: 15.0 Year(s) - 20.0 Year(s)...
Rs 1.56 - 2.16 lakhs p.a.
Urgent Requirement of Electrical & Instrument TECHNICIAN at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed ...
Rs 3 - 3.6 lakhs p.a.
...project management experience
Excellent oral and written communication skills
Detail-oriented and highly safety-conscious
BOILER FIELD ,BOILER FIELD OPERATOR
Designation: BOILER FIELD OPERATOR(POWER PLANT)
Vacancies: 1
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 20 - 25 lakhs p.a.
...organized.
Strong work ethic.
Good interpersonal skills.
Meticulous attention to detail.
Computer literate.
Proactive nature.
GM ,AGM,DGM
Designation: GENERAL MANAGER POWER PLANT (GM ) - RAIPUR ,
Vacancies: 1
Experience: 20.0 Year(s) - 25.0 Year(s)...
Rs 6 - 10 lakhs p.a.
...CONTACT FOR MORE DETAILS
TEJANSH SAHU
(***) ***-****
****@*****.***
Interview Date - Monday - Friday
SUB STATION,ELECTRICAL,MANAGER
Designation: ELECTRICAL MANAGER - SUB STATION/power plant
Vacancies: 1
Experience: 10.0 Year(s) - 15.0 Year(s)...
Rs 1.8 - 3 lakhs p.a.
...Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed...
Rs 3 - 3.6 lakhs p.a.
...Description:
Operation of power plant through DCS panel& PLC .
Cold light UP& SHUT DOWN of Boiler & Turbine activities, also do Hot boxup .
Operation of PRDS
Maintenance of turbine & maintain pressure and temperature of boiler.
Preventive Maintenance time...
Rs 2.4 - 3.6 lakhs p.a.
...reading publications, and participating in professional organizations.
JOB APPLY
Manisha +91 803520156
OPERATION ENGINEER, POWER PLANT ,ENGINEER,ELECTRICAL ,MECHANICAL ,THERMAL ENGINEER
Designation: OPERATION ENGINEER ( POWER PLANT - RAIPUR
Vacancies: 1...