Average salary: Rs1,825,000 /yearly
More statsSearch Results: 199 vacancies
Rs 1 - 2 lakhs p.a.
...Urgent requirement of Electrician for a reputed POWER Industry at Raipur location, Candidate should be responsible for : 1.Responsible... ...Attending to all electrical works in the Winery
ELECTRICIAN,POWER PLANT
Designation: ELECTRICIAN - POWER PLANT
Vacancies: 1...
Rs 5 - 6 lakhs p.a.
...Physical Analysis:
Sieve analysis of Raw & Product of different size , Tumbler Index, RI, RDI, Shatter Index , Test of coke Bulk
Density.GCS,CCS
SID Chemist,Chemistry
Designation: CHEMIST - power plant
Vacancies: 1
Experience: 5.0 Year(s) - 10.0 Year(s)...
Rs 8 - 9 lakhs p.a.
...BOE CERTIFICATE
We are Currently Looking for Sr Manager/General manager for Well reputed 10mw power plant at Bilaspur location.
Should be BOE CERTIFICATE
Operation and maintenance of boiler.
Monitoring and control on DM plant parameter.
Operation of turbine...
Rs 18 - 30 lakhs p.a.
...upcoming projects in assigned areas which accounts for nearly 40% of plant systems . - To maximise plant availability at budgeted cost... ...893007335, (***) ***-****
Go Through click & Download App
SID,POWER PLANT,VP,GM
Designation: VP/GM - POWER PLANT
Vacancies: 1...
Rs 1.8 - 3 lakhs p.a.
...Spares and consumables.
Arranging spares for equipment & updating indents in cooperation with stores as well as purchase Dept. for Power Plant Unit.
Planning for annual shutdown maintenance for BTG site after consulting from Operation dept.
Preparing of monthly...
Rs 2.4 - 3 lakhs p.a.
...Urgent Requirement of Instrument Engineer for for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in INSTRUMENT...
Rs 2.4 - 3.6 lakhs p.a.
...B.E/Diploma (Mech.) with 2 to 3 years experience as a DCS Engineer in a Power Plant in operation .
Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control...
Rs 2.4 - 3 lakhs p.a.
...direction to trade/craft and engineers.
" Exposure of overhaul and general maintenance of following equipment's / sub system of power plants :
Generator, UAT / ST and Generator transformer, Plant Aux equipment's like Motors, Breakers, Modules, Switch gears, Relays Interlock...
Rs 2.4 - 3 lakhs p.a.
...required software.
Knowledge of applicable codes related to electronic engineering.
Proficient in design and calculation software.
ELECTRICAL ENGINEER,POWER PLANT
Designation: ELECTRICAL ENGINEER - POWER PLANT
Vacancies: 3
Experience: 3.0 Year(s) - 5.0 Year(s)...
...Monitoring the safe and reliable operation of E&I equipment’s for CFBC Boilers, Turbines, ACCs, CHPs & its auxiliaries of Thermal power plant capacity 55 MW TPP, 21 MW WHRS.
Coordination with cement plant and electrical department to supply the uninterrupted power to the...
Rs 18 - 24 lakhs p.a.
...innovations, strategic business development, and the profitability of the company as determined by the company's strategic goals
V
VP,MANAGMENT,COMMUNICATION SKILL
Designation: VICE PRESIDENT/HEAD - POWER PLANT
Vacancies: 1
Experience: 15.0 Year(s) - 20.0 Year(s)...
Rs 1.56 - 2.16 lakhs p.a.
Urgent Requirement of Electrical & Instrument TECHNICIAN at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed ...
Rs 20 - 25 lakhs p.a.
...organized.
Strong work ethic.
Good interpersonal skills.
Meticulous attention to detail.
Computer literate.
Proactive nature.
GM ,AGM,DGM
Designation: GENERAL MANAGER POWER PLANT (GM ) - RAIPUR ,
Vacancies: 1
Experience: 20.0 Year(s) - 25.0 Year(s)...
Rs 6 - 10 lakhs p.a.
...CONTACT FOR MORE DETAILS
TEJANSH SAHU
(***) ***-****
****@*****.***
Interview Date - Monday - Friday
SUB STATION,ELECTRICAL,MANAGER
Designation: ELECTRICAL MANAGER - SUB STATION/power plant
Vacancies: 1
Experience: 10.0 Year(s) - 15.0 Year(s)...
Rs 3 - 3.6 lakhs p.a.
...project management experience
Excellent oral and written communication skills
Detail-oriented and highly safety-conscious
BOILER FIELD ,BOILER FIELD OPERATOR
Designation: BOILER FIELD OPERATOR(POWER PLANT)
Vacancies: 1
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 6 - 10 lakhs p.a.
...MANAGER CONTROL & INSTRUMENTATION-POWER PLANT
Description:
You'll need to develop skills in specific control disciplines, such as:
advanced process control (APC)
distributed control systems (DCS)
programmable logic controllers (PLC)
supervisory control and...
Rs 1.8 - 3 lakhs p.a.
...Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed...
Rs 8 - 12 lakhs p.a.
...Full job description
· To monitor the plant performance and to ensure power generation as per the target & analyze variance (if any)
· Plan daily activity to achieve the schedule targets of unit.
· To monitor performance for efficient utilization of resources and ensure...
Rs 2.4 - 3.6 lakhs p.a.
...reading publications, and participating in professional organizations.
JOB APPLY
Manisha +91 803520156
OPERATION ENGINEER, POWER PLANT ,ENGINEER,ELECTRICAL ,MECHANICAL ,THERMAL ENGINEER
Designation: OPERATION ENGINEER ( POWER PLANT - RAIPUR
Vacancies: 1...
Rs 1.8 - 3 lakhs p.a.
...Record and indicate instruments
Take readings from charts, meters, and gauges at established intervals
Monitor and inspect power plant equipment and indicators to detect evidence of operating problems.
Make adjustments or minor repairs, such as tightening leaking...