Search Results: 14,533 vacancies

Rs 1.8 - 3 lakhs p.a.

 ...Description:   Fitter duties and responsibilities Fitters must be able to work well with their hands and understand the complexities...  ...FITTER ,MECHANICAL Designation: Mechanical Fitter-Gujrat power plant Vacancies: 12 Experience: 2.0 Year(s) - 3.0 Year(s)... 

VINAYAK JOB CONSULTANT

Gandhinagar
5 days ago

Rs 1 - 2 lakhs p.a.

 ...Candidate should have ITI qualification and 3 year experience as Fitter in a large POWER PLANT. 3+ years of relevant experience in POWER PLANT as a mechanical Fitter Should be able to design tools and should be result oriented with time limit.o Minimum 3 to 5 years of Industry... 

VINAYAK JOB CONSULTANT

Raipur
14 days ago
 ...Monitoring the safe and reliable operation of E&I equipment’s for CFBC Boilers, Turbines, ACCs, CHPs & its auxiliaries of Thermal power plant capacity 55 MW TPP, 21 MW WHRS. Coordination with cement plant and electrical department to supply the uninterrupted power to the... 

Randstad

Raipur
7 days ago

Rs 3 - 3.6 lakhs p.a.

 ...update station operation records and prepare all required reports on plant operation. Direct supervise the operations and maintenance...  ...be appropriate. Specially perform on switching switchgear of power plant substation in LV, MV and high voltage system. Issue work... 

VINAYAK JOB CONSULTANT

Chhattisgarh
12 days ago

Rs 5 - 6 lakhs p.a.

 ...We are looking for Electrical MANAER for 8MW Power Plant at Bilaspur location. "Lead and provide technical direction to the team and responsibility for efficient and reliable maintenance of Electrical systems. Provide technical direction to trade/craft and engineers.... 

VINAYAK JOB CONSULTANT

Raipur
13 days ago

Rs 2.4 - 3.6 lakhs p.a.

 ...design and development of electricity-related products, such as power systems and household appliances. They collaborate with electronics...  ...PRABHA - (***) ***-**** ELECTRICAL ENGINEER,ELECTRICAL,POWER PLANT Designation: ELECTRICAL ENGINEER (POWER PLANT) - RAIGARH Vacancies... 

VINAYAK JOB CONSULTANT

Raigarh
8 days ago

Rs 3 - 3.6 lakhs p.a.

 ...project management experience Excellent oral and written communication skills Detail-oriented and highly safety-conscious BOILER FIELD ,BOILER FIELD OPERATOR Designation: BOILER FIELD OPERATOR(POWER PLANT) Vacancies: 1 Experience: 3.0 Year(s) - 5.0 Year(s)... 

VINAYAK JOB CONSULTANT

Raipur
11 days ago

Rs 1.8 - 3 lakhs p.a.

 ...Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed... 

VINAYAK JOB CONSULTANT

Raipur
27 days ago
 ...Ensure constant flow of electricity to avoid blackouts Monitor power-generating equipment fueled by coal, gas, nuclear energy,...  ...Electricity is one of our nations most vital resources. Power plant operators, distributors, and dispatchers control power plants and... 

ENVICARE TECHNOLOGIES PRIVATE LIMITED

Bangalore
a month ago

Rs 3.6 - 5 lakhs p.a.

 ...shift, including stocking inventory all day long until closing down at night     JOB APPLY  CONTACT - RAKESH SINHA - (***) ***-**** SHIFT INCHAGE,POWER PLANT Designation: SHIFT INCHARGE - oration POWER PLANT Vacancies: 6 Experience: 8.0 Year(s) - 12.0 Year(s)... 

VINAYAK JOB CONSULTANT

Raigarh
14 days ago
 ...record of being able to train others in a classroom environment, or equivalent demonstration of that ability to me. Good knowledge of Power BI, Power Query, and DAX. As mentioned above you don’t have to be an expert in everything across the Power BI stack, but I am looking... 

Technoledge

Delhi
2 days ago
 ...will be joining an industry leading, global organisation that has a reach in over 150 different countries. Position: The Power BI Specialist is responsible for delivering actionable reports and dashboard for business stakeholders on the performance of the department... 

Global University Systems

Hyderabad
2 days ago
 ...Power plant engineers are involved in tasks such as  equipment maintenance, troubleshooting, and repairs . Power plant engineers analyze data from various sources, such as sensors and monitoring systems, to assess plant performance, identify potential issues, and implement... 

M/S LANDCRAFT RECREATIONS PRIVATE LIMITED

Bangalore
a month ago
 ...operates a world-class 1.6 MTPA aluminium smelter and 3,615 MW thermal power generation facility in Jharsuguda, Odisha. The only Indian...  ...professionals in the position of CBM & Hydraulics Expert- Power Plant, Jharsuguda. Roles & Responsibilities: Competency mapping... 

Vedanta Limited - Aluminium Business

Jharsuguda
1 day ago

Rs 8 - 12 lakhs p.a.

 ...Spares and consumables. Arranging spares for equipment & updating indents in cooperation with stores as well as purchase Dept. for Power Plant Unit. Planning for annual shutdown maintenance for BTG site after consulting from Operation dept. Preparing of monthly... 

VINAYAK JOB CONSULTANT

Raipur
a month ago

Rs 5 - 6 lakhs p.a.

 ...Physical Analysis: Sieve analysis of Raw & Product of different size , Tumbler Index, RI, RDI, Shatter Index , Test of coke Bulk Density.GCS,CCS SID Chemist,Chemistry Designation: CHEMIST - power plant Vacancies: 1 Experience: 5.0 Year(s) - 10.0 Year(s)... 

VINAYAK JOB CONSULTANT

Raipur
more than 2 months ago
 ...Power plant operators perform a wide variety of tasks to ensure optimal and safe operation of equipment that produces and distributes electrical power. They may operate control systems, monitor gauges and meters, perform routine checks, maintain equipment and start or stop... 

RIANSHI DEVELOPERS PRIVATE LIMITED

Bangalore
12 days ago

Rs 12 - 15 lakhs p.a.

 ...Plant Capacity:20Mw 110tph Design a plan of action & review mechanism to achieve targeted operation parameters - Cost Optimization...  ...Erection & Commissioning,Preventive Maintenance Designation: Lead-Power plant Vacancies: 1 Experience: 25.0 Year(s) - 35.0 Year(s)... 

Parth Globus Infotech

Kolhapur
more than 2 months ago

Rs 2.4 - 3.6 lakhs p.a.

 ...reading publications, and participating in professional organizations.   JOB APPLY  Manisha +91 803520156 OPERATION ENGINEER, POWER PLANT ,ENGINEER,ELECTRICAL ,MECHANICAL ,THERMAL ENGINEER Designation: OPERATION ENGINEER ( POWER PLANT - RAIPUR Vacancies: 1... 

VINAYAK JOB CONSULTANT

Raipur
28 days ago

Rs 2.4 - 3.6 lakhs p.a.

 ...continuously improve manufacturing quality           JOB APPLY  CONTACT - RAKESH SINHA - (***) ***-****   TURBINE DCS ENGINEER,process,operation ,POWER PLANT Designation: TURBINE ENGINEER (POWER PLANT) - RANCHI Vacancies: 1 Experience: 4.0 Year(s) - 5.0 Year(s)... 

VINAYAK JOB CONSULTANT

Ranchi
a month ago