Average salary: Rs550,000 /yearly
More statsSearch Results: 33,902 vacancies
Rs 1 - 2 lakhs p.a.
...Urgent requirement of Electrician for a reputed POWER Industry at Raipur location, Candidate should be responsible for : 1.Responsible... ...Attending to all electrical works in the Winery
ELECTRICIAN,POWER PLANT
Designation: ELECTRICIAN - POWER PLANT
Vacancies: 1...
Rs 3.6 - 4.2 lakhs p.a.
...everything goes smoothly for everyone during a given work shift, including stocking inventory all day long until closing down at night
TIME MANAGEMENT,SHIFT INCHAGE
Designation: OPERATION SHIFT INCHARGE - POWER PLANT
Vacancies: 6
Experience: 6.0 Year(s) - 8.0 Year(s)...
Rs 1.8 - 3 lakhs p.a.
...Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed...
Rs 2.4 - 3.6 lakhs p.a.
...B.E/Diploma (Mech.) with 2 to 3 years experience as a DCS Engineer in a Power Plant in operation .
Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control...
Rs 12 - 15 lakhs p.a.
...Plant Capacity:20Mw 110tph
Design a plan of action & review mechanism to achieve targeted operation parameters
- Cost Optimization... ...Erection & Commissioning,Preventive Maintenance
Designation: Lead-Power plant
Vacancies: 1
Experience: 25.0 Year(s) - 35.0 Year(s)...
Rs 6 - 15 lakhs p.a.
...Brine chillers,
Thermic heaters/Boilers, Air compressors, DM/RO plants of any design
13 Carry out Preventive maintenance of utility... ...Utility,Maintenance
Designation: AM / DM / Manager - Utility & Power Plant
Vacancies: 3
Experience: 10.0 Year(s) - 15.0 Year(s)...
Rs 5 - 6 lakhs p.a.
...Physical Analysis:
Sieve analysis of Raw & Product of different size , Tumbler Index, RI, RDI, Shatter Index , Test of coke Bulk
Density.GCS,CCS
SID Chemist,Chemistry
Designation: CHEMIST - power plant
Vacancies: 1
Experience: 5.0 Year(s) - 10.0 Year(s)...
Rs 6 - 10 lakhs p.a.
...CONTACT FOR MORE DETAILS
TEJANSH SAHU
(***) ***-****
****@*****.***
Interview Date - Monday - Friday
SUB STATION,ELECTRICAL,MANAGER
Designation: ELECTRICAL MANAGER - SUB STATION/power plant
Vacancies: 1
Experience: 10.0 Year(s) - 15.0 Year(s)...
Rs 3 - 5 lakhs p.a.
...Job Summary: The Plant Supervisor is responsible for overseeing daily operations within the manufacturing plant. This includes managing production schedules, ensuring adherence to safety regulations, supervising staff, and optimizing processes to increase efficiency and productivity...
Rs 3 - 3.6 lakhs p.a.
...project management experience
Excellent oral and written communication skills
Detail-oriented and highly safety-conscious
BOILER FIELD ,BOILER FIELD OPERATOR
Designation: BOILER FIELD OPERATOR(POWER PLANT)
Vacancies: 1
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 2.4 - 3 lakhs p.a.
...direction to trade/craft and engineers.
" Exposure of overhaul and general maintenance of following equipment's / sub system of power plants :
Generator, UAT / ST and Generator transformer, Plant Aux equipment's like Motors, Breakers, Modules, Switch gears, Relays Interlock...
...CFBC Boilers, Turbines, ACCs, CHPs & its auxiliaries of Thermal power plant capacity 55 MW TPP, 21 MW WHRS.
Coordination with cement... ...to supply the uninterrupted power to the user departments.
Accountable for maintaining and improving the plant efficiency, optimization...
Rs 7 - 8 lakhs p.a.
...members.
CONTACT FOR MORE DETAILS
TEJANSH SAHU
(***) ***-****
****@*****.***
Interview Date - Monday - Friday
MANAGER,INSTRUMENTATION
Designation: MANAGER - INSTRUMENTATION (POWER PLANT)
Vacancies: 1
Experience: 10.0 Year(s) - 15.0 Year(s)...
Rs 8 - 9 lakhs p.a.
...BOE CERTIFICATE
We are Currently Looking for Sr Manager/General manager for Well reputed 10mw power plant at Bilaspur location.
Should be BOE CERTIFICATE
Operation and maintenance of boiler.
Monitoring and control on DM plant parameter.
Operation of turbine...
Rs 28 - 30 lakhs p.a.
...Microsoft Office
PMP / PRINCE II certification is a plus
PROJECT HEAD,HEAD,Project Management
Designation: PROJECT HEAD (SID & POWER PLANT) - Tadipatri A.P.
Vacancies: 1
Experience: 20.0 Year(s) - 25.0 Year(s)
Telephonic Interview scheduled. Apply now and attend...
Rs 8 - 12 lakhs p.a.
...Spares and consumables.
Arranging spares for equipment & updating indents in cooperation with stores as well as purchase Dept. for Power Plant Unit.
Planning for annual shutdown maintenance for BTG site after consulting from Operation dept.
Preparing of monthly...
Rs 2.4 - 3 lakhs p.a.
...Urgent Requirement of Instrument Engineer for for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in INSTRUMENT...
Rs 18 - 30 lakhs p.a.
...distribution network & upcoming projects in assigned areas which accounts for nearly 40% of plant systems . - To maximise plant availability at budgeted... ...335, (***) ***-****
Go Through click & Download App
SID,POWER PLANT,VP,GM
Designation: VP/GM - POWER PLANT...
Rs 4 - 6 lakhs p.a.
...Urgently Required MECHANICAL FOREMAN for a leading construction company for power plant Shall distribute man power to specific work location and follow-up progress.
senior Foreman shall supervise the execution of work specified in the contract and works requested...
Rs 12 - 15 lakhs p.a.
...preventive and corrective maintenance activities without disrupting plant operations.
# Troubleshoot mechanical failures, diagnose issues... ...- BHAVNA SAHU (***) ***-****
STEEL PLANT,MECHANICAL INCHARGE ,POWER PLANT,MECHANICAL HEAD,35 MW
Designation: MECHANICAL HEAD - POWER...