Average salary: Rs342,222 /yearly
More statsSearch Results: 277 vacancies
Rs 1.8 - 2 lakhs p.a.
...checking & functional checking, control valves, safety valves etc. at major shutdown jobs
Instrument Engineer,INSTRUMENT MAINT,Instrument Technician,Instrumentation,Power Plant
Designation: INSTRUMENT ENGINEER - POWER PLANT
Vacancies: 1
Experience: 2.0 Year(s) - 5....
Rs 2.4 - 3.6 lakhs p.a.
...B.E/Diploma (Mech.) with 2 to 3 years experience as a DCS Engineer in a Power Plant in operation .
Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control...
Rs 1.8 - 3 lakhs p.a.
...indents in cooperation with stores as well as purchase Dept. for Power Plant Unit.
Planning for annual shutdown maintenance for BTG site... ...report, unit costing as per Power generator.
MW,MECHANICAL ENGINEER,POWER PLANT
Designation: MECHANICAL ENGINEER - POWER PLANT...
Rs 2.4 - 4 lakhs p.a.
...Architect for drawings.Prepare electrical load details.
electrical engineer,Electrical Project,Electrical Design,Building Electrical Engineer... ...Electrical Engineer
Designation: ELECTRICAL ENGINEER - THARMAL POWER
Vacancies: 1
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 2.4 - 3 lakhs p.a.
...Urgent Requirement of Instrument Engineer for for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in INSTRUMENT...
Rs 2.4 - 3 lakhs p.a.
...Electrical Engineer Job Description Template
We are hiring an electrical engineer to design and implement complex industrial, commercial... ...Proficient in design and calculation software.
ELECTRICAL ENGINEER,POWER PLANT
Designation: ELECTRICAL ENGINEER - POWER PLANT...
Rs 2.4 - 3 lakhs p.a.
...maintenance of Electrical systems.
Provide technical direction to trade/craft and engineers.
" Exposure of overhaul and general maintenance of following equipment's / sub system of power plants :
Generator, UAT / ST and Generator transformer, Plant Aux equipment's...
Rs 1.8 - 3 lakhs p.a.
...meters, and gauges at established intervals
Monitor and inspect power plant equipment and indicators to detect evidence of operating... ...CONTACT - RAKESH SINHA - (***) ***-****
TURBINE OPERATOR ,TG FIELD ENGINEER
Designation: TURBINE FIELD ENGINEER - 16MW POWER PLANT - TILDA...
Rs 8 - 9 lakhs p.a.
...BOE CERTIFICATE
We are Currently Looking for Sr Manager/General manager for Well reputed 10mw power plant at Bilaspur location.
Should be BOE CERTIFICATE
Operation and maintenance of boiler.
Monitoring and control on DM plant parameter.
Operation of turbine...
Rs 1 - 2 lakhs p.a.
...Urgent requirement of Electrician for a reputed POWER Industry at Raipur location, Candidate should be responsible for : 1.Responsible for electrical repair & maintenance. 2.Responsible for preventive maintenance of all machines of various departments. 3. Responsible for operation...
Rs 5 - 6 lakhs p.a.
...Physical Analysis:
Sieve analysis of Raw & Product of different size , Tumbler Index, RI, RDI, Shatter Index , Test of coke Bulk
Density.GCS,CCS
SID Chemist,Chemistry
Designation: CHEMIST - power plant
Vacancies: 1
Experience: 5.0 Year(s) - 10.0 Year(s)...
Rs 18 - 30 lakhs p.a.
...availability at budgeted cost ensuring safety & environment standards
Mr. Ritesh Agrawal
(***) ***-****, (***) ***-****
Go Through click & Download App
SID,POWER PLANT,VP,GM
Designation: VP/GM - POWER PLANT
Vacancies: 1
Experience: 20.0 Year(s) - 25.0 Year(s)...
...Monitoring the safe and reliable operation of E&I equipment’s for CFBC Boilers, Turbines, ACCs, CHPs & its auxiliaries of Thermal power plant capacity 55 MW TPP, 21 MW WHRS.
Coordination with cement plant and electrical department to supply the uninterrupted power to the...
Rs 1.56 - 2.16 lakhs p.a.
Urgent Requirement of Electrical & Instrument TECHNICIAN at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed ...
Rs 18 - 24 lakhs p.a.
...innovations, strategic business development, and the profitability of the company as determined by the company's strategic goals
V
VP,MANAGMENT,COMMUNICATION SKILL
Designation: VICE PRESIDENT/HEAD - POWER PLANT
Vacancies: 1
Experience: 15.0 Year(s) - 20.0 Year(s)...
Rs 1 - 2 lakhs p.a.
...Candidate should have ITI qualification and 3 year experience as Fitter in a large POWER PLANT.
3+ years of relevant experience in POWER PLANT as a mechanical Fitter Should be able to design tools and should be result oriented with time limit.o Minimum 3 to 5 years of Industry...
Rs 3 - 3.6 lakhs p.a.
...project management experience
Excellent oral and written communication skills
Detail-oriented and highly safety-conscious
BOILER FIELD ,BOILER FIELD OPERATOR
Designation: BOILER FIELD OPERATOR(POWER PLANT)
Vacancies: 1
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 20 - 25 lakhs p.a.
...organized.
Strong work ethic.
Good interpersonal skills.
Meticulous attention to detail.
Computer literate.
Proactive nature.
GM ,AGM,DGM
Designation: GENERAL MANAGER POWER PLANT (GM ) - RAIPUR ,
Vacancies: 1
Experience: 20.0 Year(s) - 25.0 Year(s)...
Rs 6 - 10 lakhs p.a.
...CONTACT FOR MORE DETAILS
TEJANSH SAHU
(***) ***-****
****@*****.***
Interview Date - Monday - Friday
SUB STATION,ELECTRICAL,MANAGER
Designation: ELECTRICAL MANAGER - SUB STATION/power plant
Vacancies: 1
Experience: 10.0 Year(s) - 15.0 Year(s)...
Rs 1.8 - 3 lakhs p.a.
...Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed...