Search Results: 109 vacancies
Rs 2 - 5 lakhs p.a.
...Transformer, HT/LT Panel,
MCC panel, APFC, DG & motor etc. installation & commissioning with all safety
norms.
• Tracking of project material consumption.
• Check safety from electrical hazards perspective.
• Temporary power arrangement to all fabricators with routine...
...subcontract survey work.
Reviews and provides input to project controls documents on progress relating to cost and schedule, and material receiving reports and warehousing to assure delivery of correct materials.
Develops project construction procedures.
Plans and...
Rs 3 - 5 lakhs p.a.
...AMC of Equipments.
• Planning & executing shut down activities of all rotatory & static equipment’s.
• Spares management, PR/PO, material Indenting, procurement, inspection of spares and inventory
controls.
• Maintaining daily record of utility consumption.
• Introduce...
...subcontractor’s management staff within the area of responsibility.
Monitors subcontractor construction schedules, resource charts, and material and equipment requirements.
Reviews subcontractor construction methods, schedules, manning charts, and material and equipment...
...subcontractor’s management staff within the area of responsibility.
Monitors subcontractor construction schedules, resource charts, and material and equipment requirements.
Reviews subcontractor construction methods, schedules, manning charts, and material and equipment...
Rs 5 - 8 lakhs p.a.
...customer needs.
Contracting of the services like vehicle hiring, canteen, pest control, etc.
Vendor development based on required material.
Participate in key activities in technical projects.
Plan work improvement activities and performance improvement strategies....
Rs 4 - 6 lakhs p.a.
...preventive action.
4) Maintaining work permit system at plant.
5) Identify potentially hazardous biological, chemical and radiological materials and collect samples of them for analysis.
6) Inspect and evaluate the environment, equipment and processes in working areas to...
Rs 3 - 4 lakhs p.a.
...and logically to resolve various issues in the development process.
8.Set a perfect schedule for purchase of equipment s and raw materials.
9.Last but not the least, the civil engineer must ensure that the project is completed on time within the planned budget.
Civil...
...maturity, discretion, tact, integrity and work ethics.
Ability of ensuring forward and backward linkages/ arrangements viz. raw materials, Coal, Power, infrastructure, marketing arrangement including strengthening the dealer network, and other logistical infrastructure...
...engineering liaison to the design functional group. Interprets design drawings and specifications. Supervises field verification of materials. Provides technical direction to contractors in construction engineering and design functions relating to civil engineering in an area...
...engineering liaison to the design functional group. Interprets design drawings and specifications. Supervises field verification of materials. Provides technical direction to contractors in construction engineering and design functions relating to rigging engineering in an...
...Implements controls over variables affecting job progress to ensure engineering and procurement provide timely delivery of drawings, materials, and equipment and to ensure that other corporate programs/rigging operations are fully utilized.
Coordinates with the Site...
Rs 3 - 5 lakhs p.a.
...allocation and planning for reporting team as per business and customer requirement
- Ensure preparation and implementation of raw material quality and workmanship (Preventive maintenance and Conditioning monitoring schedule) during and after completion of civil works
-...
Rs 3 - 7 lakhs p.a.
# Process design engineering (Basic, detailing & Improvement)
# Preparation of Material balance, PFDs, heat balance, and capacity calculations for a product.
# Preparation & review of P&IDs as per standards. Generate documents for design projects including Process Flow Diagrams...
Rs 2 - 4 lakhs p.a.
...Raw Material, Packaging Material, Finish Goods,
Raw Material, Packaging Material, Finish Goods,
Day to Day Stores activity
SAP is knowledge is must
Monthly stock verification
GRN, Inward, Outward, Bills Checking, Material Checking, MIGO, MIRO, Etc...
Rs 5.25 - 6.25 lakhs p.a.
...production schedules.
Ensure that finished products meet quality standards and customer specifications.
Determine equipment, materials and manpower required to complete production.
Resolve production issues and escalate unresolved issues to management promptly....
Rs 4 - 5 lakhs p.a.
...seals, gear boxes, agitators ,blowers , reactors, etc.
Handling shift jobs in plant
Should have knowledge of Indenting and material issue
Preparation of daily utility reports
Experience on Condition monitoring of equipment will have an added advantage...
Rs 2 - 4 lakhs p.a.
...or test processes and speculate with accuracy the reason for them.
Record, report, and interpret test results.
Order raw materials and request supplies for projects as needed.
Clean and maintain test equipment.
Maintain effective communications in...
Rs 2 - 4 lakhs p.a.
...create various technical drawings.
Preparing both rough sketches and detailed work with CADD systems.
Performing calculations for materials and weight limitations.
Communicating with architects and engineers, and incorporating knowledge gained into drawings....
...incorporating analysis of blueprints, technical drawings, and other project specifications. Calculate direct and indirect costs including materials, labor, and overhead based on historical data and project-specific information. Ensure all estimates are accurate and compliant with...