Average salary: Rs480,302 /yearly
More statsSearch Results: 15 vacancies
...check, grade, Elongation%, Bend test ,Re-bend Test, Ring test & A.R. value
~ Thermex parameter setting as per size, mill speed and Inlet, outlet temperature
~ E.R.P maintain for issue test certificate with proper communication with Dispatch and SMS Q.C
~ Certified Internal...
...development and Non Conformance/ DAR's/ TAD and QN assessment of complex fabrications such as casings, rings, complex unit mounting, fairings, inlets/Outlets & fairings
Experience in design , development and installations for engine external components such as ducts, harness,...
...development and Non Conformance/ DAR's/ TAD and QN assessment of complex fabrications such as casings, rings, complex unit mounting, fairings, inlets/Outlets & fairings
Experience in design , development and installations for engine external components such as ducts, harness,...
Rs 3 - 4 lakhs p.a.
...DCS, PLC.
10 To run the plant with maximum efficiency as per standard.
11 Daily maintain of ETP/MEE/ RoO logbook.
12 Monitoring inlet/outlet effluent parameters and hazardous waste as per
environmental regulations standard.
13 Wastewater treatment operations and...
...controls and Instrumentation etc.,
~ Mechanical Investigation deals issues related to Packaging engineering, Enclosures, Ancillary system (Inlet and Exhaust systems to Enclosure and Equipment's'. i.e. Involves Ducting), Driver train (Usually takes care by 3rd party supplier,...
Rs 3 - 5 lakhs p.a.
...DCS, PLC.
10 To run the plant with maximum efficiency as per standard.
11 Daily maintain of ETP/MEE/ RoO logbook.
12 Monitoring inlet/outlet effluent parameters and hazardous waste as per
environmental regulations standard.
13 Wastewater treatment operations and...
...Reporting and Documentation.
· Water conservation measures.
22. Periodical sampling and testing of Raw water, Treated water, STP inlet, and outlet samples.
23. Periodical Reporting to the management.
24. Waste management such as Plastic waste, Used PPE, Electronic...
...axial compressors, including preliminary and detailed definition of flow path and airfoils, preliminary and detailed design of compressor inlets, and annular diffusers. Tasks also include qualification test planning and execution. The Compressor Aerodynamics Group supports new...
...Property estimation using Aspen HYSYS
Hydraulic calculations for Pump and compressor circuits
Relief Load Estimation, PSV Sizing, Inlet and Outlet Line Sizing
Flare Header sizing using Aspen Flare System Analyzer, Flare Load Summary
P&ID development, preparation...
Rs 3 - 6 lakhs p.a.
# Stream wise effluent analysis from inlet to outlet (ETP/MEE/UF/RO/STP) with the parameter pH, COD, TDS, NH3N, SVI, DO
# Maintaining of lab instruments and its calibration record
# ET P Plant and lab housekeeping
# Preparation lab solution
# Trouble shooting and maintenance...
...potential over pressure and vacuum scenarios (new
& existing) - relief device (PSV, RD, conservation vents) relief load calculation, inlet and outlet
line sizing, size selection and datasheet preparation, and relief/flare load summary preparation.
Design, model,...
...interconnecting
piping & supports, miniskirt cross piping & supports, Pipe and cable tranches layout
Machinery baseplate frames & piping, inlet plenum drains piping for GT, piping full supply, plant
interconnecting piping & support
General arrangement for water injection...
...interconnecting piping & supports, miniskirt cross piping & supports, Pipe and cable tranches layout
Machinery base plate frames & piping, inlet plenum drains piping for GT, piping full supply, plant interconnecting piping & support
General arrangement for water injection...
...Job Description
- Process Planning of Inlet / Outlet Valve
- Value stream planning, BPS , integrated quality management
- Introduction and support of new planning tools and techniques, implementation of new process or improve the existing processes
- Project management...
...of Workers Requested: 25 Job Duties: On farms, install equipment in cage-free poultry facility. Pre-assembly (2%), installation of air inlets (4%), assembly of Cage System (61%), feed bins (1%), catwalks and decks (8%), conveyor belt (2%), and installation of chain feed...