Average salary: Rs772,500 /yearly
More statsSearch Results: 418 vacancies
Rs 1.8 - 2 lakhs p.a.
...functional checking, control valves, safety valves etc. at major shutdown jobs
Instrument Engineer,INSTRUMENT MAINT,Instrument Technician,Instrumentation,Power Plant
Designation: INSTRUMENT ENGINEER - POWER PLANT
Vacancies: 1
Experience: 2.0 Year(s) - 5.0 Year(s)...
Rs 8 - 9 lakhs p.a.
...BOE CERTIFICATE
We are Currently Looking for Sr Manager/General manager for Well reputed 10mw power plant at Bilaspur location.
Should be BOE CERTIFICATE
Operation and maintenance of boiler.
Monitoring and control on DM plant parameter.
Operation of turbine...
Rs 8 - 12 lakhs p.a.
...To get maintenance data for Boiler’s & Turbine areas and evaluation of maintenance performance.
To continuously monitor/measure contract... ...indents in cooperation with stores as well as purchase Dept. for Power Plant Unit.
Planning for annual shutdown maintenance for BTG...
Rs 7 - 8 lakhs p.a.
...members.
CONTACT FOR MORE DETAILS
TEJANSH SAHU
(***) ***-****
****@*****.***
Interview Date - Monday - Friday
MANAGER,INSTRUMENTATION
Designation: MANAGER - INSTRUMENTATION (POWER PLANT)
Vacancies: 1
Experience: 10.0 Year(s) - 15.0 Year(s)...
Rs 2.4 - 3 lakhs p.a.
...support, or testing activities.
Writing reports and compiling data regarding existing and potential electrical engineering projects and... ...in design and calculation software.
ELECTRICAL ENGINEER,POWER PLANT
Designation: ELECTRICAL ENGINEER - POWER PLANT
Vacancies...
Rs 1.8 - 2.4 lakhs p.a.
...Communicating with the rigging and construction team.
Breaking down rigging equipment and conducting post-rigging inspections.
Rigger,POWER PLANT,RIGGER
Designation: RIGGER - mechanical maintenance (POWER PLANT) - RAIPUR
Vacancies: 1
Experience: 1.0 Year(s) - 5.0...
Rs 18 - 30 lakhs p.a.
...availability at budgeted cost ensuring safety & environment standards
Mr. Ritesh Agrawal
(***) ***-****, (***) ***-****
Go Through click & Download App
SID,POWER PLANT,VP,GM
Designation: VP/GM - POWER PLANT
Vacancies: 1
Experience: 20.0 Year(s) - 25.0 Year(s)...
Rs 1 - 2 lakhs p.a.
...Urgent requirement of Electrician for a reputed POWER Industry at Raipur location, Candidate should be responsible for : 1.Responsible for electrical repair & maintenance. 2.Responsible for preventive maintenance of all machines of various departments. 3. Responsible for operation...
Rs 5 - 6 lakhs p.a.
...Physical Analysis:
Sieve analysis of Raw & Product of different size , Tumbler Index, RI, RDI, Shatter Index , Test of coke Bulk
Density.GCS,CCS
SID Chemist,Chemistry
Designation: CHEMIST - power plant
Vacancies: 1
Experience: 5.0 Year(s) - 10.0 Year(s)...
Rs 3 - 3.6 lakhs p.a.
...activities of the plant.
Monitor and interpret plant operating data and render decision.
Assist in planning and scheduling the operations... ...be appropriate.
Specially perform on switching switchgear of power plant substation in LV, MV and high voltage system.
Issue work...
Rs 10 - 15 lakhs p.a.
...the design and development of electricity-related products, such as power systems and household appliances. They collaborate with... ...and performance analysis on new and legacy IT systems
Summarize data and report on test results
Examine needs on new equipment, calculate...
Rs 1.56 - 2.16 lakhs p.a.
Urgent Requirement of Electrical & Instrument TECHNICIAN at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed ...
Rs 2.4 - 3.6 lakhs p.a.
...B.E/Diploma (Mech.) with 2 to 3 years experience as a DCS Engineer in a Power Plant in operation .
Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control...
Rs 1 - 2 lakhs p.a.
...Candidate should have ITI qualification and 3 year experience as Fitter in a large POWER PLANT.
3+ years of relevant experience in POWER PLANT as a mechanical Fitter Should be able to design tools and should be result oriented with time limit.o Minimum 3 to 5 years of Industry...
...Monitoring the safe and reliable operation of E&I equipment’s for CFBC Boilers, Turbines, ACCs, CHPs & its auxiliaries of Thermal power plant capacity 55 MW TPP, 21 MW WHRS.
Coordination with cement plant and electrical department to supply the uninterrupted power to the...
Rs 2.4 - 4 lakhs p.a.
...load details.
electrical engineer,Electrical Project,Electrical Design,Building Electrical Engineer,Real Estate Electrical Engineer,Construction Electrical Engineer
Designation: ELECTRICAL ENGINEER - THARMAL POWER
Vacancies: 1
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 2.4 - 3 lakhs p.a.
...Urgent Requirement of Instrument Engineer for for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in INSTRUMENT...
Rs 18 - 24 lakhs p.a.
...innovations, strategic business development, and the profitability of the company as determined by the company's strategic goals
V
VP,MANAGMENT,COMMUNICATION SKILL
Designation: VICE PRESIDENT/HEAD - POWER PLANT
Vacancies: 1
Experience: 15.0 Year(s) - 20.0 Year(s)...
Rs 20 - 25 lakhs p.a.
...performance and productivity.
Analyzing accounting and financial data.
Researching and identifying growth opportunities.... ...Proactive nature.
GM ,AGM,DGM
Designation: GENERAL MANAGER POWER PLANT (GM ) - RAIPUR ,
Vacancies: 1
Experience: 20.0 Year(s)...
Rs 1.8 - 3 lakhs p.a.
...Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed...