Average salary: Rs420,000 /yearly
More statsSearch Results: 3 vacancies
...or a relevant experience in oil and gas construction field ( refinery, petrochemicals, offshore platform, power plant, piping project, boiler manufacturing, if any)
• Minimum of 5 to 10 years of experience in the oil and gas industry, with a focus on refinery construction,...
...to the Plant Manager, shift engineer is responsible for the day-to-day shift operation of the 2 SMRs, ASU, Syngas and integrated gas turbine plants based on the Air Products Kochi Plant and ensuring shift operating team to operate the plants safely and efficiently to facilitate...
Rs 18 per hour
...Corporation.
The plant consists of
~2x80 MMSCFD Steam Methane Reformers (SMR) with PSA’s for H2 purification.
~18 MW Kawasaki Gas Turbine integrated with both reformers.
~ An Air Products Air Separation Unit (ASU) Producing Nitrogen and Oxygen.
~ Amine System for CO2...