Average salary: Rs2,828,570 /yearly
More statsSearch Results: 13,637 vacancies
Rs 1.2 - 1.8 lakhs p.a.
...cutting lines onto work piece, allowing for stock thickness welder,iti welder,industrial welder,mig welding,gas welding,mag welding,steel plant welder
welder,iti welder,industrial welder,mig welding,gas welding,mag welding,steel plant welder`
Designation: WELDER...
A Leading Integrated Steel Plant A Leading Integrated Steel Plant of Central India seeks candidates for the following position at various location for Sales & Marketing of TMT Bars in entire Odisha, Madhya Pradesh & Chhattisgarh Manager(s) Candidate should be self-motivated...
Rs 1.8 - 3 lakhs p.a.
...materials used and hours worked.
Requirements:
Proven experience as a Welder in an industrial setting, preferably in a sponge iron power plant or similar heavy industry.
Proficiency in various welding techniques including SMAW, GTAW, and GMAW.
Ability to work at...
Rs 1.8 - 2 lakhs p.a.
...functional checking, control valves, safety valves etc. at major shutdown jobs
Instrument Engineer,INSTRUMENT MAINT,Instrument Technician,Instrumentation,Power Plant
Designation: INSTRUMENT ENGINEER - POWER PLANT
Vacancies: 1
Experience: 2.0 Year(s) - 5.0 Year(s)...
Rs 8 - 9 lakhs p.a.
...BOE CERTIFICATE
We are Currently Looking for Sr Manager/General manager for Well reputed 10mw power plant at Bilaspur location.
Should be BOE CERTIFICATE
Operation and maintenance of boiler.
Monitoring and control on DM plant parameter.
Operation of turbine...
Rs 8 - 10 lakhs p.a.
...We are currently Looking for HR Head for reputed Steel Plant at Raipur Location
Essential Duties and Responsibilities
Analyzes wage and salary reports and data to determine competitive compensation plan.
Writes directives advising department managers of Company...
Rs 7 - 8 lakhs p.a.
...members.
CONTACT FOR MORE DETAILS
TEJANSH SAHU
(***) ***-****
****@*****.***
Interview Date - Monday - Friday
MANAGER,INSTRUMENTATION
Designation: MANAGER - INSTRUMENTATION (POWER PLANT)
Vacancies: 1
Experience: 10.0 Year(s) - 15.0 Year(s)...
Rs 1 - 2 lakhs p.a.
...Urgent requirement of Electrician for a reputed POWER Industry at Raipur location, Candidate should be responsible for : 1.Responsible... ...Attending to all electrical works in the Winery
ELECTRICIAN,POWER PLANT
Designation: ELECTRICIAN - POWER PLANT
Vacancies: 1...
Rs 5 - 6 lakhs p.a.
...Physical Analysis:
Sieve analysis of Raw & Product of different size , Tumbler Index, RI, RDI, Shatter Index , Test of coke Bulk
Density.GCS,CCS
SID Chemist,Chemistry
Designation: CHEMIST - power plant
Vacancies: 1
Experience: 5.0 Year(s) - 10.0 Year(s)...
A Leading Integrated Steel Plant A Leading Integrated Steel Plant of Central India seeks candidates for the following position at various location for Sales & Marketing of TMT Bars in entire Odisha, Madhya Pradesh & Chhattisgarh Officer Tender Cell Candidate should be well...
Rs 12 - 15 lakhs p.a.
...Plant Capacity:20Mw 110tph
Design a plan of action & review mechanism to achieve targeted operation parameters
- Cost Optimization... ...Erection & Commissioning,Preventive Maintenance
Designation: Lead-Power plant
Vacancies: 1
Experience: 25.0 Year(s) - 35.0 Year(s)...
Rs 10 - 12 lakhs p.a.
...Requirement for General Manager HR Steel Plant for Reputed Steel Plant at raipur Location.
In charge of all Personal administration HR Work.
Entire salary working. (Payroll)
Responsible for end to end recruitment and selection process. Responsible for completing...
Rs 18 - 30 lakhs p.a.
...upcoming projects in assigned areas which accounts for nearly 40% of plant systems . - To maximise plant availability at budgeted cost... ...893007335, (***) ***-****
Go Through click & Download App
SID,POWER PLANT,VP,GM
Designation: VP/GM - POWER PLANT
Vacancies: 1...
Rs 8 - 12 lakhs p.a.
...Spares and consumables.
Arranging spares for equipment & updating indents in cooperation with stores as well as purchase Dept. for Power Plant Unit.
Planning for annual shutdown maintenance for BTG site after consulting from Operation dept.
Preparing of monthly...
A Leading Integrated Steel Plant A Leading Integrated Steel Plant of Central India seeks candidates for the following position at various location for Sales & Marketing of TMT Bars in entire Odisha, Madhya Pradesh & Chhattisgarh Sales Support Executive Qualification: Graduate...
Rs 1.8 - 2.4 lakhs p.a.
...Communicating with the rigging and construction team.
Breaking down rigging equipment and conducting post-rigging inspections.
Rigger,POWER PLANT,RIGGER
Designation: RIGGER - mechanical maintenance (POWER PLANT) - RAIPUR
Vacancies: 1
Experience: 1.0 Year(s) - 5.0 Year(...
...GM AVP Operation Power Plant
Qualification: Diploma /B.Tech /EE Mechanical
Exp: 15+ Yrs
Track record of successfully developing & streamlining systems with ability to enhance operational
effectiveness and meet the operational goals Instrumental in changing cable...
Rs 1.2 - 1.44 lakhs p.a.
...order to secure a conviction
Operate firearms and electronic surveillance equipment
JOB APPLY
CONTACT - DIMPAL - (***) ***-****
DET ELECTRICAL/MECH,DET
Designation: DET ELECTRICAL/MECH (POWER PLANT) - ODISHA
Vacancies: 15
Experience: 0 - 1.0 Year(s)...
Rs 2.4 - 3 lakhs p.a.
...required software.
Knowledge of applicable codes related to electronic engineering.
Proficient in design and calculation software.
ELECTRICAL ENGINEER,POWER PLANT
Designation: ELECTRICAL ENGINEER - POWER PLANT
Vacancies: 3
Experience: 3.0 Year(s) - 5.0 Year(s)...
Rs 6 - 9 lakhs p.a.
...Daily monitoring and control of energy consumption of the entire plant.
To ensure compliance with quality standards and maintain related... ...To ensure control on running cost of utilities.
To maintain Power Factor at the company level. Adherence to monthly & yearly...